The busiest toll station in Henan has changed its "core" to "beauty"

The busiest toll station in Henan has changed its "core" to "beauty"

Zhengzhou south toll station after blocking and reconstruction. (Reporter Song Min)

  As the "window" for drivers and passengers to pass through Henan, the expressway toll station is directly related to the external image of Henan. Recently, with the completion of the main project of the toll station congestion control and reconstruction project with the largest traffic volume in the province, the airport expressway Zhengzhou South toll station has a new bright spot, which has created a new mode of expressway toll station traffic in the province. How did the busiest toll station in Henan change its "core" beauty and "face"? On April 7, the reporter conducted an interview to reveal the secret.

  "In the traditional toll station lane design, the toll island is a’ hard isolation’ measure to ensure safety, channelize traffic and place electromechanical equipment." The relevant person in charge of Zhongyuan Expressway Airport Branch said that in the process of actively exploring the frontier technology of transportation and seeking a "good solution to traffic congestion", it was decided to boldly implement the "island-free" and "island-shrinking" layout of Zhengzhou South Toll Station without increasing the land area.

  Some safety islands were demolished, and the original lane layout was broken by using the "soft isolation" method of marking lines and elastic columns, and four toll islands were cancelled, and the lane width was widened from 3.2 meters to 3.6 meters. The width of the original six toll islands has been reduced from the original 2.2m to 0.5m, 1.2m and 1.8m respectively, thus saving the occupied space by adding two entrance lanes and a tidal lane.

  "Zhengzhou South Station has increased from 8 entrance lanes before the renovation to 11 lanes, which not only optimizes the traffic environment, ensures traffic safety and improves traffic efficiency, but also lays the foundation for more intelligent’ free flow’ traffic in the future." Lin Xiangyang, stationmaster of Zhengzhou South Toll Station, said.

  According to statistics, the daily average ETC vehicles in Zhengzhou South Toll Station account for about 80%. In order to improve the traffic efficiency of ETC vehicles and reduce the occurrence rate of special events, the station pioneered the "dual antenna layout mode" of "one master and one standby" at the entrance ETC lane. The success rate of ETC vehicles will be as high as 99.3%, the occurrence rate of special events will be reduced to 0.7%, and the traffic efficiency will be improved by 30%. By repeatedly fine-tuning the antenna trading area, the antenna anti-interference problem between adjacent lanes after "island removal and island contraction" can be effectively solved.

  "ETC lane, normal lane", "ETC lane, abnormal transaction", "ETC lane, Henan A××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××

  "In the process of renovation and upgrading, we have integrated the license plate recognition equipment, fare display and automatic barrier machine, which are standard in traditional toll lanes, and cooperated with intelligent lighting and new luminous railing arm to provide a brand-new traffic experience for drivers and passengers in the past." Lin Xiangyang said, at the same time, an intelligent lighting guidance system and a driveway broadcasting system will be added, with red representing the occurrence of special events and green representing normal traffic. The LED light under the entrance ETC lane can be used as a road guide sign at the same time, echoing the color system of the new light-emitting railing arm, and transmitting information according to the data of the toll collection system, so as to realize the intelligent lighting guidance effect of red stopping and green traveling and moving lights running.

  At present, the main project of the reconstruction project of Zhengzhou South Toll Station has basically ended. According to the calculation, the theoretical traffic capacity of the station entrance has been increased from the current 3,600 trips/hour to 4,800 trips/hour, and the traffic efficiency has been improved by about 33%, which can meet the traffic demand for vehicle growth in the next three years. At the same time, the iterative upgrade of Zhengzhou South Railway Station has made a useful exploration for the unattended and smarter, safer and more efficient "free flow" traffic of expressway toll stations in our province.

  Providing a smooth and safe traffic environment for people to travel, and providing high-quality and fast travel services are the due rights of drivers and passengers to pay for highways, and also the proper meaning of building a new highland of business environment in our province. The Tenth Five-Year Development Plan of Digital Transportation in Henan Province issued by the Provincial Department of Transportation proposes that digital means will be used to build a smart expressway tailored to the road from the perspectives of improving the efficiency of regional road networks and slowing down traffic jams. Relying on new technologies such as ETC gantry and vehicle tracking, the smart toll station project of ETC free-flow rapid passage pilot in Zhengzhou Ring Expressway was carried out to improve the operation efficiency of toll stations. (Reporter Song Min)